- Location: Auburn, Maine
- Project Description: Construction of HVAC and plumbing systems for a 40,000 sq ft electroplating addition to the existing manufacturing facility.
- Challenge: In addition to a tight construction schedule, tie-ins to existing systems could not impact production
General Electric
![](https://nasonmechanical.com/wp-content/uploads/2014/11/GE-sign-1024x577.jpg)